Publication:
Minimizing Liability of the COVID-19 Pandemic on Construction Contracts—A Structural Equation Model for Risk Mitigation of Force Majeure Impacts

dc.contributor.authorChadee, A. A
dc.contributor.authorGallage, S
dc.contributor.authorMartin, H. H
dc.contributor.authorRathnayake, U
dc.contributor.authorRay, I
dc.contributor.authorKumar, B
dc.contributor.authorSihag, P
dc.date.accessioned2023-02-07T04:12:37Z
dc.date.available2023-02-07T04:12:37Z
dc.date.issued2023-01
dc.description.abstractA pandemic is a force majeure event, and contracting parties can invoke conditions under force majeure to minimize liability for unforeseen, uncontrollable, and unavoidable circumstances. This study develops a conceptual model to assist in the management of delays and cost overruns due to force majeure events arising from the construction sector in Small Island Developing States (SIDS). A critical case study analysis of past epidemics and pandemics was conducted to develop a survey questionnaire for administration to construction professionals in Trinidad and Tobago. Based on the empirical data of 65 construction professionals, the structural equation model shows that there are strong causal effects from the implications of COVID-19 and force majeure events, which in turn have a dire impact on the construction industry. The leading implication of COVID-19 is the drastic increases in the cost of materials. Also, granting an extension of time to contractors was the main risk variable under the force majeure conditions. From the results, the measurement model verifies that events under force majeure and its perceived implications strongly influence the construction industry, and proposes that force majeure contractual clauses require explicit treatment of the periodic reoccurrence of pandemics to avoid conflicts among contracting parties. This research explores and builds on new avenues from the latest COVID-19 scholarship to better understand existing impacts on the construction industry, and consequently add to the novel body of knowledge on the implications of pandemics on construction contracts. Overall, this research provides a risk-guidance framework for construction professionals and academia to mitigate unforeseen, uncontrollable, and unavoidable risks on construction projectsen_US
dc.identifier.citationChadee, A.A.; Gallage, S.; Martin, H.H.; Rathnayake, U.; Ray, I.; Kumar, B.; Sihag, P. Minimizing Liability of the COVID-19 Pandemic on Construction Contracts—A Structural Equation Model for Risk Mitigation of Force Majeure Impacts. Buildings 2023, 13, 70. https://doi.org/10.3390/buildings13010070en_US
dc.identifier.doi10.3390/buildings13010070en_US
dc.identifier.issn20755309
dc.identifier.urihttps://rda.sliit.lk/handle/123456789/3225
dc.language.isoenen_US
dc.publisherMDPIen_US
dc.relation.ispartofseriesBuildings;Volume 13, Issue 1,No 70
dc.subjectconstructionen_US
dc.subjectcontractsen_US
dc.subjectCOVID-19en_US
dc.subjectforce majeureen_US
dc.subjectliabilityen_US
dc.subjectstructural equation modeling (SEM)en_US
dc.titleMinimizing Liability of the COVID-19 Pandemic on Construction Contracts—A Structural Equation Model for Risk Mitigation of Force Majeure Impactsen_US
dc.typeArticleen_US
dspace.entity.typePublication

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
buildings-13-00070.pdf
Size:
1.71 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: