Repository logo
Repository
Browse
SLIIT Journals
OPAC
Log In
  1. Home
  2. Browse by Author

Browsing by Author "Perera, B.K.C"

Filter results by typing the first few letters
Now showing 1 - 2 of 2
  • Results Per Page
  • Sort Options
  • Thumbnail Image
    PublicationOpen Access
    Appropriateness of Commercial Mediation as an Alternative Dispute Resolution Method for Subcontractor Disputes in Sri Lanka
    (Sri Lanka Institute of Information Technology, 2023-03-25) Hettiarachchi, D.D; Wijesinghe, T; Perera, B.K.C
    Disputes in relation to construction sub-contractors are undeniable and quite diversified in common dispute arena with the legal concerns arising out of Doctrine of Privity of Contracts. Continuation of these disputes can adversely affect the cost, quality, and time metrics in a construction project. The merits of commercial mediation as an alternative dispute resolution method, in this regards Sri Lankan construction industry were less explored. Thus, the aim of this research is to determine the appropriateness of commercial mediation as an alternative dispute resolution method for subcontractor disputes. To achieve this aim, a mixed research approach was adopted. Qualitative data was collected through semi structured expert interviews. Then through a questionnaire survey, quantitative data has been gathered. While qualitative data were analyzed through content analysis, quantitative data were analyzed through relative importance index and descriptive analysis based on central tendency dispersion. Initially, both common attributes of commercial mediation and subcontractor disputes in construction industry were listed out. Then, the inter-relationship between two factors were observed. According to the findings, bespoke and incomplete contracts, subcontractor unawareness and lack of knowledge about contract details, liability and responsibility issues, failure to respond in time, interface issues and lack of coordination were identified as the most significant attributes of subcontractor disputes. Further, it was proven that except the attribute ‘having freedom to accept or reject the solution’, all the other attributes of commercial mediation were applicable in resolving subcontractor disputes. Hence, the commercial mediation was determined as an appropriate alternative dispute resolution method in resolving subcontractor disputes in construction projects. All the limitations and necessary recommendations for further studies are presented at the end of the study.
  • Thumbnail Image
    PublicationOpen Access
    The Impact of Labour Motivation on Project Performance with an Insight into the Sri Lankan Construction Industry
    (Sri Lanka Institute of Information Technology, 2023-03-25) Lakshan, H.G.S; Wijesinghe, T; Perera, B.K.C
    Construction labour is a vital resource in the construction industry as they mostly reshape the raw materials into skyscrapers and other living enclosures. In Sri Lanka, the construction industry has been constantly exposed to many uncertainties and challenges. Being a developing country that lead to many socio-economic issues and constant changes in the living standards caused demotivational impacts on the Sri Lankan labour force. Thus, optimizing labour productivity through labour motivation is a significant challenge due to the various category and type of labours. This study aims to identify and evaluate different labour motivational factors in improving the building construction project performances. In accomplishing the aim, the mixed method approach was used and 5 number of interviews, 39 questionnaire responses were taken into the analysis. After the analysis there were 14 most significant labour motivation factors which applicable for Sri Lankan building construction industry. Cost centers for those were collected from the expert interviews and their cost on motivation factors were analyzed the data collected from the questionnaire. After the analysis financial and time cost centers have been identifies as the major cost centers that have been incurred when implementing labour motivational factors. Moreover, checked the association between labour motivational factors and project performance in terms of time saving, cost saving and quality improvement. As a result, they were associated with them. A framework was developed to aid in the selection of best motivational factors in optimizing project performance. As the last part of this study, the motivational recommendations were made to increase the labour productivity. Furthermore, these findings will be useful in optimizing building project performance.

Copyright 2025 © SLIIT. All Rights Reserved.

  • Privacy policy
  • End User Agreement
  • Send Feedback