Scopus Index Publications
Permanent URI for this communityhttps://rda.sliit.lk/handle/123456789/2162
This collection consists of all Scopus-indexed publications produced by SLIIT researchers. Scopus is recognized worldwide as a leading and reputable academic indexing database.
Browse
6 results
Search Results
Publication Open Access Restoring life expectancy in low-income countries: the combined impact of COVID-19, health expenditure, GDP, and child mortality(BioMed Central Ltd, 2025-03-06) Karunarathne, M.; Buddhika, P; Priyamantha, A; Mayogya, P; Jayathilaka, R; Dayapathirana, NBackground: Life expectancy is a vital indicator of a country’s health and progress. Low-income countries face uncertainty regarding the long-term impact of the COVID-19 pandemic, driven by health expenditure levels, concerns over rising child mortality rates, and decreasing per capita income. These factors challenge life expectancy and demand urgent attention. This study aims to identify patterns, challenges, and opportunities to improve life expectancy in these countries through better health policies and resource allocation. Methods: The research investigates the impact of the COVID-19 pandemic, health expenditure, per capita income, and child mortality rates on life expectancy in low-income countries. By examining 22 years of data from 20 countries, using a comprehensive dataset from the Our World in Data database, this study employs panel regression and time series analysis to explore how these factors influence life expectancy. Results: The findings indicate a significant negative effect of COVID-19 on life expectancy, while health expenditure and per capita income show a positive impact. Conversely, child mortality rates exert a negative effect on life expectancy in low-income countries. Conclusion: This research contributes to the existing body of knowledge by analysing how COVID-19, health expenditure, per capita income, and child mortality collectively affect life expectancy in low-income countries. The insights gained may inform policymakers and health consultants about the need for targeted interventions, prioritising healthcare investment and child health. By addressing these critical areas, it may be possible to improve life expectancy and overall health outcomes, thus contributing to global health equity. © The Author(s) 2025.Publication Open Access COVID-19 symptom identification using Deep Learning and hardware emulated systems(Elsevier, 2023-06-28) Liyanarachchi, R; Wijekoon, J; Premathilaka, M; Vidhanaarachchi, SThe COVID-19 pandemic disrupted regular global activities in every possible way. This pandemic, caused by the transmission of the infectious Coronavirus, is characterized by main symptoms such as fever, fatigue, cough, and loss of smell. A current key focus of the scientific community is to develop automated methods that can effectively identify COVID-19 patients and are also adaptable for foreseen future virus outbreaks. To classify COVID-19 suspects, it is required to use contactless automatic measurements of more than one symptom. This study explores the effectiveness of using Deep Learning combined with a hardware-emulated system to identify COVID-19 patients in Sri Lanka based on two main symptoms: cough and shortness of breath. To achieve this, a Convolutional Neural Network (CNN) based on Transfer Learning was employed to analyze and compare the features of a COVID-19 cough with other types of coughs. Real-time video footage was captured using a FLIR C2 thermal camera and a web camera and subsequently processed using OpenCV image processing algorithms. The objective was to detect the nasal cavities in the video frames and measure the breath cycles per minute, thereby identifying instances of shortness of breath. The proposed method was first tested on crowd-sourced datasets (Coswara, Coughvid, ESC-50, and a dataset from Kaggle) obtained online. It was then applied and verified using a dataset obtained from local hospitals in Sri Lanka. The accuracy of the developed methodologies in diagnosing cough resemblance and recognizing shortness of breath was found to be 94% and 95%, respectively.Publication Open Access Minimizing Liability of the COVID-19 Pandemic on Construction Contracts—A Structural Equation Model for Risk Mitigation of Force Majeure Impacts(MDPI, 2023-01) Chadee, A. A; Gallage, S; Martin, H. H; Rathnayake, U; Ray, I; Kumar, B; Sihag, PA pandemic is a force majeure event, and contracting parties can invoke conditions under force majeure to minimize liability for unforeseen, uncontrollable, and unavoidable circumstances. This study develops a conceptual model to assist in the management of delays and cost overruns due to force majeure events arising from the construction sector in Small Island Developing States (SIDS). A critical case study analysis of past epidemics and pandemics was conducted to develop a survey questionnaire for administration to construction professionals in Trinidad and Tobago. Based on the empirical data of 65 construction professionals, the structural equation model shows that there are strong causal effects from the implications of COVID-19 and force majeure events, which in turn have a dire impact on the construction industry. The leading implication of COVID-19 is the drastic increases in the cost of materials. Also, granting an extension of time to contractors was the main risk variable under the force majeure conditions. From the results, the measurement model verifies that events under force majeure and its perceived implications strongly influence the construction industry, and proposes that force majeure contractual clauses require explicit treatment of the periodic reoccurrence of pandemics to avoid conflicts among contracting parties. This research explores and builds on new avenues from the latest COVID-19 scholarship to better understand existing impacts on the construction industry, and consequently add to the novel body of knowledge on the implications of pandemics on construction contracts. Overall, this research provides a risk-guidance framework for construction professionals and academia to mitigate unforeseen, uncontrollable, and unavoidable risks on construction projectsPublication Open Access IMPLEMENTING SAFE WORKING CYCLE (SWC) CONCEPT AMIDST THE COVID-19 CRISIS IN SRI LANKA(Ceylon Institute of Builders, 2022-06-26) Rasanjana, H.P; Allis, CThe phenomenon of COVID-19 has introduced critical challenges in the architecture, engineering, and the entire construction industry. A safe Working Cycle is a Japanese concept. It incorporates to enhances the effective implementation of safety management systems, thereby helping to prevent health and safety issues. This research mainly aims at identifying the strategies for overcoming barriers to implementing the Safe Working Cycle (SWC) concept during the COVID-19 pandemics in Sri Lanka. The research study focused more on reducing health-related illnesses caused by COVID-19 than on the other physical safety issues at the construction site. In such a critical health issue, the protection of human resources, an essential part of the construction industry, should be prioritized. The aim of the Study was reached through the sequential mixed method. The semi-structured expert interviews were initially conducted, and after that questionnaire survey was achieved among health and safety officers in construction projects in Sri Lanka. In the semi-structured interviews, data were analyzed using Nvivo thematic analysis software and questionnaire survey; M.S. Excel analyzed the collected data. Following the findings, several potential barriers were arisen to implementing the SWC concept in the Sri Lankan construction industry: including limited Budget allocation, poor safety attitude, limited land space, strict project schedules, and unawareness of workers. Further, this Study also indicated several potential practical strategies to overcome these barriers identified for SWC implementation. Such as; Implementing the COVID-19 bio bubble concept, Organizing regular toolbox meetings, demonstrating sign boards specific to this new concept, arranging separate systematic time slots, buildup a good communication network. The safe Working Cycle (SWC) is not currently practised in Sri Lankan construction culture. However, health and safety professionals are familiar with almost every aspect of the Safe Working Cycle (SWC); therefore, it is possible to put this into practice in the Sri Lankan construction industry. © 2022, Ceylon Institute of BuildersPublication Open Access EFFECT OF COVID-19 ON THE SMALL-SCALE CONSTRUCTION COMPANIES: THE CASE OF COLOMBO DISTRICT, SRI LANKA(Ceylon Institute of Builders, 2022-06-26) Gunarathna, N; Namarathna, C. PCOVID-19 is a global pandemic that has wreaked havoc on the lives of many individuals and has had a severe impact on the global economy. During this crisis, small and medium-scale businesses suffer the most and are the least prepared among all companies as per the previous studies done in other parts of the world. The majority of the small-scale construction firms in Sri Lanka act as subcontractors and generate job opportunities for a considerable number of people and are able to create a multiplier effect on the whole economy. However, it was observed that they are more vulnerable to the adverse impact of the pandemic. Thus, the principal goal of this research is to explore possible survival strategies to overcome critical financial issues of small-scale construction companies during the ongoing COVID-19 pandemic in Sri Lanka. A mixedmethod approach was adopted to gather the data for the study. A comprehensive literature review was carried out to identify the impact of COVID-19 on both global and local construction industries. The data for this study was gathered using semi-structured interviews and a comprehensive questionnaire survey with small scale construction company owners and construction industry professionals. The findings highlighted the key financial issues faced by the small-scale construction companies due to the pandemic including delays in client payments, supply chain management issues, frequent price escalation of construction materials, and inability to repay loans. The respondents suggested creating partnerships with financially strong companies, reduction of unwanted expenses, modifying supply chain channels and agreements, and ensuring business continuity plans as the strategies to be used to overcome the financial burden that occurred due to the pandemic.Publication Open Access Factors influencing the timely completion of construction projects in Sri Lanka(Public Library of Science, 2022-12-15) Abeysinghe, N; Jayathilaka, RTimely completion is a crucial factor for the success of a construction project, especially in the Sri Lankan context. This study aims to identify the most influential factors that affect the timely completion of construction projects in Sri Lanka. Thirty-nine factors were identified through a comprehensive literature review and experts’ opinions. A questionnaire incorporating the 39 project delay factors was distributed among 163 Civil Engineers, and responses were obtained. Random sampling method was adopted to select the sample. The Relative Importance Index (RII) analysed and ranked the project delay factors. The top ranked significant project delay factors were identified as shortage of skilled subcontractors/suppliers, shortage of labourers (Skilled, semi-skilled, unskilled), financial difficulties of contractors, delay in delivering materials to the site, and Covid-19 pandemic situation. According to the main three respondent types, i.e., clients/owners, contractors and consultants, the contractor related factors was the key group among others that delay a construction project. The scientific value of the study includes assisting the Sri Lankan construction industry to identify the factors affecting the timely completion of construction projects, and developing mitigation methods and strategies. Also, the stakeholders could duly schedule the construction work by identifying areas that need more attention. The contribution of this study would assist stakeholders to adopt a proactive approach by identifying mistakes on their part and minimising potential issues that lead to construction project delays in Sri Lanka. Figures
